Ziarul Financiar has interviewed eight real estate consultancy firms to draw up
a top of the business centers that suit best the criteria of the companies
looking for new headquarters. Extremely dynamic on the office market, in the
past years, OCTAGON has been contractor
within 6 of these projects.
Victoria Center
building on Calea Victoriei, Sky Tower near Promenada Mall, where OCTAGON has
performed infrastructure works in top-
down system and AFI Business Park near AFI Palace Cotroceni Mall are the
office projects in Bucharest that fit most of the criteria.
Victoria Center is the
most attractive office building in Bucharest, with a leasable area under 10,000
sqm, Sky Tower is the brokers’ favorite building over 10,000 sqm, while AFI Park
is the highest rated business park, according to the analysis which took ten
criteria into account.
Olympia Tower |
The projects divided
into three categories – under 10,000 sqm, over 10,000 sqm and business parks –
have been graded from 5 to 1 upon 10 criteria: technical specifications,
access, space efficiency, operational efficiency, visibility and design,
quality of administration services, building and surrounding facilities,
price/quality ration, high parking rate and good reputation of existing
tenants.
Green Gate |
Located in a central
area, on Decebal Blvd., Olympia Tower office building is one of the most modern
in Bucharest, with an area under 10,000 sqm. OCTAGON has performed the infrastructure works (diaphragm walls,
bored piles, general excavation, crown beam) and superstructure works for this building.
Among buildings with areas over 10,000 sqm, Green Gate, located on Tudor Vladimirescu Blvd. in Bucharest is one of the most recently delivered. OCTAGON has been specialized contractor for the office building and has performed geotechnical works: diaphragm walls, bored piles, dewatering systems and crown beam. The building has 10 floors and a 39,000 sqm total area.
Hermes Business Campus |
Green Court Bucharest- Building A |
OCTAGON has also been
involved in the construction of two of the largest office parks in Bucharest:
Hermes Business Campus (Dimitrie Pompeiu Blvd.) and Green Court Bucharest (Gara
Herastrau St.). The company was general
contractor for the first office building within the complex. After delivering building A of Green
Court Bucharest complex, developed by real estate giant Skanska, OCTAGON is
continuing the superstructure works to
building B, which will be delivered this year.
Green Court Bucharest- Building B |
On the list of
projects built by OCTAGON, listed in ZF top there is also Floreasca Park, located
in northern Bucharest on Pipera Road. OCTAGON was specialized contractor and
performed geotechnical works within the
building.
For more information click HERE.
OCTAGON CONTRACTING & ENGINEERING
Phone: (+4)021.232.39.20
No comments:
Post a Comment