Location: North
of Bucharest, 12 Gara Herastrau Street
Description:
- 3 modern office buildings
- 12 floors above the ground
- 52,000 sqm of leasable space
- 837 underground parking spaces
Developer: Skanska
Development Romania
Infrastructure and structure contractor for
buildings A & B: Octagon Contracting & Engineering under Skanska
Construction Romania
Developer’s
testimonial about the contractor:
“Skanska
Construction appointed Octagon as construction partner for foundation and
structural works on the Green Court Bucharest.
The cooperation was excellent and Octagon performed the works
professionally and diligently meeting all of our expectations in terms of
health and safety, quality and delivery time.” says Richard Burleigh, Country Manager, Skanska
Construction Romania.
Biggest challenges
faced by the contractor:
“The biggest challenge
in the execution of this project was meeting the deadline, which was very
tight. But despite the schedule
constraints, which were also amplified by technical issues that are unavoidable
in any project, we managed to focus on our main targets and deliver the works
on time.“ says Max Ene- OCTAGON’s project
manager for Green Court Bucharest.
Construction works
performed by OCTAGON:
- Concrete works for infrastructure and superstructure of building A (3B+ GF+ 11F)
- Excavation;
- Diaphragm walls D 600;
- Anchorages;
- Infrastructure works for building B;
- Concrete works for the superstructure of building B (3B + GF+ 11F)
- energy efficient façade with high performance which reduces solar heat gains, the building’s heating up being significantly limited;
- natural daylight- over 75% of the building space has access to the daylight. Automatic lighting control system adjusts the lights according to the intensity of outside light resulting into lower energy consumption;
- containers for segregated waste;
- solar panels- located on the roof of the building, used for domestic hot water;
- electrical plug- in for cars
Estimated benefits:
- Lower utility bills- 50% less water consumed
- A healthier, more productive workplace- 30% more fresh air in the office
- More efficient lighting- 32% less energy consumed
OCTAGON’s staff
involved in the construction of buildings A & B: 160 people.