Showing posts with label foundation works. Show all posts
Showing posts with label foundation works. Show all posts

Tuesday, December 16, 2014

Video: OCTAGON built the foundation in top- down system for Sky Tower- the tallest building in Romania

Reaching 137 m in height and counting 5 underground levels and 37 ground levels, Sky Tower is the tallest building in Romania. The building, located on Calea Floreasca is visible from any area of Bucharest. OCTAGON CONTRACTING & ENGINEERING built the foundation of Sky Tower and performed thus the deepest excavation in Romania, so far: 50 m. The infrastructure works also included the execution of diaphragm walls D 1,000, foundation barrettes D 600 and dewatering systems. OCTAGON performed the construction in top- down system of three reinforced concrete slabs, covering 4,600 sqm each. The video renders the entire execution process of the foundation works.


OCTAGON CONTRACTING & ENGINEERING

Mai multe informatii aici

Telefon: (+4) 021.232.39.20

Friday, September 12, 2014

OCTAGON has performed two thirds of the contracted works for the rehabilitation of Brasov- Simeria railway, Coslariu- Sighisoara section


Brasov- Simeria Railway

OCTAGON CONTRACTING & ENGINEERING has performed two thirds of the contracted works for the rehabilitation of Brasov- Simeria railway, Coslariu- Sighisoara section, two years from the beginning of the project. The delivery term is November 2014. The beneficiary of the project is the National Railroads Company (CFR) and the general contractor for Coslariu- Sighisoara section is the Portuguese company FCC Construccion.

Brasov – Simeria railroad is a component of the Fourth Pan – European Corridor. The objective of the project is to rehabilitate and
Sheet pile installation
modernize 89.5 km of double electric powered railway line between Sighişoara and Coşlariu, including all the connecting structures and auxiliary works, to ensure a maximum speed of 160 km/h for passenger trains.

The following works will be performed within the project: rehabilitation of 63.46 km of double electric powered railway line; building 26.04 km of double electric power railway line; rehabilitation of 10 railway stations.
Sheet pile execution and retention systems

The rehabilitation of the railway road will be performed with European financing, acquired within the Priority Axis nr. 1 „Modernizing and Development of Priority Axis TEN-T, with the Purpose to Develop a Sustainable Transport System and its Integration in the EU Transport Networks.", Major Intervention Domain 1.2 „Modernizing and Development of Railroad Infrastructure over the Priority Axis TEN-T 22".

Bored piles execution and retention systems
OCTAGON is performing the following works for the construction of section II- Coslariu- Sighisoara: drilling of bored piles D 1.000, anchorages, stone columns, sheet pile installation and gunite for tunnels and bridge.

OCTAGON also has four other ongoing infrastructure projects. OCTAGON is geotechnical construction contractor at one of the most important infrastructure projects in Bucharest: ”The underground road passage from Piata Presei”, where the
Sheet pile extraction
company is building diaphragm walls.  The passage will have a total length of 550 meters and two exits. One of the exits will lead to Kiseleff Road and the second one will lead to Marasti Blvd.,  allow crossing the area on any direction and subsequently connect public ground transport, the railway line and the bus lines, with the station of the future metro line 6. The purpose of the passage is to streamline the traffic in one of the most crowded areas of the capital. 

Consolidation works
Another important project under construction, within which OCTAGON is working, is Lugoj- Deva Highway. The company is building bored piles for sections A, D and E, sector 2. The highway will stretch over 100 km on delivery.  Sector 2 will be 28 km long.

OCTAGON is performing foundation works: bored piles and sheet piles at the project “Passage over the rail road km 5 + 343” in Craiova.
Sheet pile retention systems

The fourth project started this year by OCTAGON is  “Functional rehabilitation of Revolutiei Square from Slobozia”. The company is part of ACM4- Romprest- TIAB- OCTAGON Consortium and is performing geotechnical works: metal sheet piles and drilling for dewatering systems, within a parking lot project.

“Even if infrastructure has not been a priority for public investments this year and the market is not going through a dynamic period, we have four new ongoing projects and we are continuing works at the rehabilitation of Brasov- Simeria railroad, a project started in 2012.  But the perspectives for infrastructure development are positive. After four years of slowdown, the infrastructure will inevitably become the engine of the construction market development.” said Mr. Alexandros Ignatiadis, co-founder and shareholder of OCTAGON CONTRACTING & ENGINEERING.


 
For more information click HERE
OCTAGON CONTRACTING & ENGINEERING
Phone: (+4)021.232.39.20

Thursday, September 11, 2014

OCTAGON HAS ONGOING INFRASTRUCTURE PROJECTS WORTH AROUND 3 MIL. EURO IN 2014




Press      release                                                                                                                                                                                                                                                                                                                     
                                                                                                                                                     September 10th 2014

Bucharest, September 10th 2014:  OCTAGON CONTRACTING & ENGINEERING, one of the major players on the geotechnical and civil construction markets in Romania, has won road infrastructure projects worth around 3 million euro in 2014. 

*      Four road infrastructure contracts
*      Geotechnical works
*      Locations: Craiova, Slobozia, Lugoj- Deva

“Even if infrastructure has not been a priority for public investments this year and the market is not going through a dynamic period, we have four new ongoing projects and we are continuing works at the rehabilitation of Brasov- Simeria railroad, a project started in 2012.  But the perspectives for infrastructure development are positive. After four years of slowdown, the infrastructure will inevitably become the engine of the construction market development.” said Mr. Alexandros Ignatiadis, co-founder and shareholder of OCTAGON CONTRACTING & ENGINEERING.

OCTAGON is geotechnical construction contractor at one of the most important infrastructure projects in Bucharest: ”The underground road passage from Piata Presei”, where the company is building diaphragm walls.  The passage will have a total length of 550 meters and two exits. One of the exits will lead to Kiseleff Road and the second one will lead to Marasti Blvd.,  allow crossing the area on any direction and subsequently connect public ground transport, the railway line and the bus lines, with the station of the future metro line 6. The purpose of the passage is to streamline the traffic in one of the most crowded areas of the capital.  

Another important project under construction, within which OCTAGON is working, is Lugoj- Deva Highway. The company is building bored piles for sections A, D and E, sector 2. The highway will stretch over 100 km on delivery.  Sector 2 will be 28 km long.

OCTAGON is performing foundation works: bored piles and sheet piles at the project “Passage over the rail road km 5 + 343” in Craiova.
The fourth project started this year by OCTAGON is  “Functional rehabilitation of Revolutiei Square from Slobozia”. The company is part of ACM4- Romprest- TIAB- OCTAGON Consortium and is performing geotechnical works: metal sheet piles and drilling for dewatering systems, within a parking lot project.


OCTAGON CONTRACTING & ENGINEERING (www.octagon.com.ro ) is a Romanian company set up
in 2005, headquartered in Bucharest. The company also has a branch in Baghdad (Iraq).  With a 19.6 million euro in 2013, large scale projects in Romania, Iraq, Greece, Turkey and Bulgaria, OCTAGON is one of the main players in the civil and geotechnical construction sectors, in Romania. The company has become active in the infrastructure sector in the past five years, when it started contracting important projects.
 
Among the reference works performed by OCTAGON in Romania there are: the office complex Green Court Bucharest (Gara Herastrau Street- Bucharest), the tallest office building in Bucharest Sky Tower (Barbu Vacarescu Blvd.), the office building Olympia Tower (Decebal Blvd.- Bucharest) and the Combined Cycle Power Plant 867 MW OMV- Petrom (Brazi- Prahova county).

Contact
OCTAGON CONTRACTING & ENGINEERING
Corina Ilie
Public relations specialist
Tel: (+40) 769 249 286