Showing posts with label sheet pile. Show all posts
Showing posts with label sheet pile. Show all posts

Friday, September 12, 2014

OCTAGON has performed two thirds of the contracted works for the rehabilitation of Brasov- Simeria railway, Coslariu- Sighisoara section


Brasov- Simeria Railway

OCTAGON CONTRACTING & ENGINEERING has performed two thirds of the contracted works for the rehabilitation of Brasov- Simeria railway, Coslariu- Sighisoara section, two years from the beginning of the project. The delivery term is November 2014. The beneficiary of the project is the National Railroads Company (CFR) and the general contractor for Coslariu- Sighisoara section is the Portuguese company FCC Construccion.

Brasov – Simeria railroad is a component of the Fourth Pan – European Corridor. The objective of the project is to rehabilitate and
Sheet pile installation
modernize 89.5 km of double electric powered railway line between Sighişoara and Coşlariu, including all the connecting structures and auxiliary works, to ensure a maximum speed of 160 km/h for passenger trains.

The following works will be performed within the project: rehabilitation of 63.46 km of double electric powered railway line; building 26.04 km of double electric power railway line; rehabilitation of 10 railway stations.
Sheet pile execution and retention systems

The rehabilitation of the railway road will be performed with European financing, acquired within the Priority Axis nr. 1 „Modernizing and Development of Priority Axis TEN-T, with the Purpose to Develop a Sustainable Transport System and its Integration in the EU Transport Networks.", Major Intervention Domain 1.2 „Modernizing and Development of Railroad Infrastructure over the Priority Axis TEN-T 22".

Bored piles execution and retention systems
OCTAGON is performing the following works for the construction of section II- Coslariu- Sighisoara: drilling of bored piles D 1.000, anchorages, stone columns, sheet pile installation and gunite for tunnels and bridge.

OCTAGON also has four other ongoing infrastructure projects. OCTAGON is geotechnical construction contractor at one of the most important infrastructure projects in Bucharest: ”The underground road passage from Piata Presei”, where the
Sheet pile extraction
company is building diaphragm walls.  The passage will have a total length of 550 meters and two exits. One of the exits will lead to Kiseleff Road and the second one will lead to Marasti Blvd.,  allow crossing the area on any direction and subsequently connect public ground transport, the railway line and the bus lines, with the station of the future metro line 6. The purpose of the passage is to streamline the traffic in one of the most crowded areas of the capital. 

Consolidation works
Another important project under construction, within which OCTAGON is working, is Lugoj- Deva Highway. The company is building bored piles for sections A, D and E, sector 2. The highway will stretch over 100 km on delivery.  Sector 2 will be 28 km long.

OCTAGON is performing foundation works: bored piles and sheet piles at the project “Passage over the rail road km 5 + 343” in Craiova.
Sheet pile retention systems

The fourth project started this year by OCTAGON is  “Functional rehabilitation of Revolutiei Square from Slobozia”. The company is part of ACM4- Romprest- TIAB- OCTAGON Consortium and is performing geotechnical works: metal sheet piles and drilling for dewatering systems, within a parking lot project.

“Even if infrastructure has not been a priority for public investments this year and the market is not going through a dynamic period, we have four new ongoing projects and we are continuing works at the rehabilitation of Brasov- Simeria railroad, a project started in 2012.  But the perspectives for infrastructure development are positive. After four years of slowdown, the infrastructure will inevitably become the engine of the construction market development.” said Mr. Alexandros Ignatiadis, co-founder and shareholder of OCTAGON CONTRACTING & ENGINEERING.


 
For more information click HERE
OCTAGON CONTRACTING & ENGINEERING
Phone: (+4)021.232.39.20

Monday, July 14, 2014

OCTAGON contractor within four infrastructure projects although the sector dropped by 28% in the first five months


    Lacking consistent public investments the road infrastructure, a sector which should support the entire economy, dropped by 27.7% in the first five months of this year, Ziarul Financiar writes, reporting the data of the National Statistics Institute (INS).
    The steep decline registered by the construction works was generated by lower investments in public projects. Thus, investments reached 7.5 billion lei (1.7 billion euro) in the first five months, a 26% decline on the same period of last year, according to the information displayed on the Finance Ministry website. Investments accounted for 1.1% of the GDP between January and May.

“The elections have not influenced the road infrastructure sector positively and this is due to the fact that we have not reached political stability yet. During the elections a great amount of construction investment funds are redirected, through budget amendments towards public sectors which could bring votes, such as pensions, to influence the electorate.”, said Alexandros Ignatiadis, co-founder and shareholder of OCTAGONCONTRACTING & ENGINEERING, in an interview broadcast by ZF Live.

   Despite the sector decline, OCTAGON contracted works on three infrastructure projects this year.
Piata Presei Libere 1
   The newest infrastructure project of the company is “The underground passage from Piata Presei Libere” (Bucharest). The company is performing here geotechnical works: diaphragm walls D 9,950 sqm, thickness 80 cm.
Piata Presei Libere 2

   The company is also working on the rehabilitation of the railway Brasov- Simeria, section 2 Coslariu- Sighisoara, sector Micasasa- Coslariu, the works consisting in the execution of bored piles D 1,000,anchorages, stone columns and sheet pile installation, a project within which Aktor is general contractor.
    OCTAGON is also executing bored piles for sections A, D and E, sector 2- Lugoj- Deva Highway, for the contractor Salini Impregilo.